Dodge Data & Analytics released the findings of a landmark study that provides a comprehensive examination of the current state and future expectations for prefabrication and modular construction. The Prefabrication and Modular Construction 2020 SmartMarket Report was published with the support of Bradley Corp., the Modular Building Institute, Pinnacle Infotech, MCAA and Skender and takes a close look at critical drivers, obstacles and benefits of using these methods, based on insight from architects, engineers and contractors already leveraging them.

The report shows that architects, engineers and contractors that have used these methods plan to significantly increase their engagement with them, especially for healthcare facilities, hotels and motels, multifamily projects and college buildings and dormitories, which are at the vanguard of the new wave of interest in these methods. Critical trends in the construction industry, such as shorter project schedules and workforce shortages, are several drivers of wider use of these methods, and technology – like building information modeling – is enabling increased use.

In order to better understand the critical drivers and obstacles for using these methods and the benefits achieved, the study focuses on the architects, engineers and contractors already using them.

When it comes to methods already in use, the study shows that:

  • Prefabricating single-trade assemblies (such as plumbing assemblies behind the wall in hospital rooms) is widely practiced, with 62% of respondents using prefabricated single-trade assemblies in the last three years.
  • 48% of those doing modular are using panelized modular components (such as wall or floor panels).
  • Use of each of these methods is also expected to increase in the next three years

However, most interesting growth is expected in practices less widely used now:

  • Prefabricated multi-trade assemblies, which involve the work of several trades combined together (such as a corridor rack in a hospital) will be used by 58% of those doing prefabrication in general—up dramatically from the 33% using this approach now.
  • Equally dramatic growth is seen among those doing modular construction in the use of full volumetric approach, in which entire parts of buildings (such as bathrooms or hotel and hospital rooms) are delivered preconstructed onsite and assembled together. A striking 61% expect to employ that method on at least 10% of their projects in the next three years, up from just 44% of those doing modular construction who report using this method currently.

“It comes as no surprise to us that more developers and GCs plan to use modular construction over the next few years,” said Tom Hardiman, executive director of the Modular Building Institute. “The lack of adequate housing and the shortage of skilled labor, coupled with chronic cost and schedule overruns are leading more people toward this process.”

And when it comes to benefits of use:

  • About 90% report they achieve improved productivity, improved quality and increased schedule certainty when using these methods compared to traditional stick-built construction.
  • 80% or more also report they see improved cost predictability, reduced waste and increased client satisfaction.
  • Improved schedule performance, decreased construction costs and improved quality are also the top drivers for increasing their use of prefabrication and modular construction in the next three years.

The use of building information modeling is also tied to the experience of those benefits. Among those using BIM on the majority of their projects, 60% credit it with improving the schedule performance of their prefabricated or modular projects, and 50% with improving budget performance. “BIM improves the prefabrication and modular process by providing the means to accelerate the design early enough to take advantage of these approaches and then offering certainty during the entire process,” says Steve Jones, senior director of industry insights at Dodge Data and Analytics. “Having these tools help enable the industry to invest more in the use of multi-trade assemblies and volumetric construction in particular, and may be contributing to the strong growth expected in these areas.”

The greatest growth in the use of these methods will be in building types in which they are already well established, such as healthcare facilities, hotels and motels, multifamily and college buildings and dormitories. However, a sizable percentage also expect low-rise offices, K-12 schools, public buildings and commercial warehouse to experience a high frequency of use of prefabrication or modular construction.

The Prefabrication and Modular Construction 2020 SmartMarket Report is available for free download at https://www.construction.com/toolkit/reports/prefabrication-modular-construction-2020.

###

About Dodge Construction Network
Dodge Construction Network harnesses data, analytics, and industry connections to be the leading source of insights and opportunities in the commercial construction industry. With five trusted solutions-Dodge Construction Central, The Blue Book, Sweets, IMS, and Principia-Dodge connects construction professionals across all stages of the building process. Designed for both small teams and large enterprises, these tools simplify complexity, empowering you to build thriving businesses and communities. With over a century of experience, Dodge Construction Network is the catalyst for modern construction. To learn more, visit construction.com.

Media Contact:
| pr@construction.com

Previous Article
The Economy: What’s Around the Bend?
Next Article
Construction Starts Dip Slightly in February